Copy Lead Integrated Master Scheduler positions focus on delivering results in their domain. This page aggregates open Copy Lead Integrated Master Scheduler roles and what employers typically expect.
**Join us in our mission to commercialize fusion energy ⚡️** **About Type One Energy** Type One Energy Group is mission-driven to provide sustainable, affordable fusion power to the world. Established in 2019 and venture-backed in 2023, the company is led by a team of globally recognized fusion scientists with a strong track record of building state-of-the-art stellarator fusion machines, together with veteran business leaders experienced in scaling companies and commercializing energy technologies. If you are searching for the best new ideas and share our vision, join us as a Lead Integrated Master Scheduler. This is what you need to know: **Location:** Knoxville, TN **Salary:** Highly Competitive Plus Benefits **Contract:** Permanent, full time **Reporting to:** Director of Project Controls **Your role in the mission:** The Master Scheduler is accountable for developing, maintaining, and defending a credible, fully integrated master schedule for the FusionDirect Program from the perspective of Type One Energy as the project owner. This role is not administrative; it is a technical and analytical role responsible for ensuring the program schedule is logically sound, sufficiently detailed, resource‑informed, and suitable for customer commitments. Crucially, this role will act as the scheduling authority over our EPC/EPCM contractor, AECOM. The Master Scheduler must be able to build schedules based on program understanding, challenge incomplete or optimistic inputs from contractors, and perform detailed schedule analysis to expose risks, critical path drivers, and integration gaps across engineering, procurement, manufacturing, construction, and commissioning. **Key Responsibilities** **Owner-Side EPCM Management & Integration** - Manage the AECOM construction EPC/EPCM schedule, ensuring its logic and milestones seamlessly integrate into the overarching Type One Energy master schedule. - Serve as the single point of accountability for schedule integration across internal teams and external contractors (e.g., EPC, design partners). - Act as the owner's primary scheduling representative to hold AECOM and other tier-1 contractors accountable for baseline compliance and float management. **Integrated Master Schedule Development & Governance** - Develop and maintain the FusionDirect Integrated Master Schedule (IMS), integrating multiple project and subsystem schedules into a single, coherent program baseline. - Establish and set the overarching schedule reporting processes and progress measurement rules (Rules of Credit) for both internal teams and external EPCMs. - Ensure all schedule logic is explicit, defensible, and traceable, with clearly defined dependencies, milestones, and handoffs. - Drive schedule maturity by enforcing sufficient task‑level detail. **Schedule Credibility & Detail Discipline** - Ensure schedules reflect realistic durations, proper sequencing, and credible assumptions. - Require and validate clearly defined scope per activity, measurable completion criteria, logical predecessors and successors, and alignment to engineering, procurement, and construction realities. - Actively identify and correct schedule anti‑patterns (open ends, excessive constraints, artificial float, logic loops). **Critical Path & Risk Analysis** - Perform regular critical path, near‑critical path, and float analysis across the program. - Conduct what‑if and scenario analysis to assess impacts of design changes, long‑lead procurement, vendor performance, and resource constraints. - Partner with PMs and Engineering Directors to develop schedule‑based mitigation plans for high‑risk or slipping scope. **Program Controls, EVM & Executive Reporting** - Align the master schedule with program cost, earned value, and risk management processes in coordination with Programs and Finance. - Establish the framework and actively manage future Earned Value Management (EVM) tracking, including running Schedule Performance Index (SPI) and Cost Performan…